SCREW PILE CALCULATOR

Get an estimate using our Screw Pile Calculator.

Insert a price per metre to generate cost estimates based on number of screw piles and depth.

Katana Foundations

Screw Pile Savings Calculator

Foundation Cost Comparison Tool

Your Project Details

Required fields *

Grayed months are in the past

Fill in the required fields above to unlock the savings calculator.

Complete your details above

Fill in the required fields and click View My Savings to unlock the full calculator.

Project Configuration

Results update instantly
1255075100
0.1m2.5m5m7.5m10m

Cost Saving

—

vs. concrete bored pier

Carbon Avoided

—

of CO₂ saved

🌳 — trees / year  or  🚗 — km driven

Energy Saved

—

MJ of energy saved

⚡ Fully power — homes for 3 months

Cost & Savings Comparison

Concrete Bored Pier Total

—

—

Katana Screw Pile Total

—

—

Saving with Screw Pile

—

—

Visual Cost Share Comparison
Bored Pier
Screw Pile
Bored Pier
Screw Pile
Cost Item Concrete Bored Pier Katana Screw Pile
Labour & installation — —
Spoil removal & disposal — —
Concrete pump, covers & inspections — —
Materials (× 50 piers) — —
Engineering Certification — —
Time delay overhead costs — —
Total Estimated Cost — —

Advanced Settings

Environmental Impact

Source

Carbon Saved

Global Warming Potential (GWP)

—

kg CO₂eq avoided on this project

Trees / year

—

mature trees absorbing CO₂

Or driving

— km

in an average car

Energy Saved

Embodied Energy Consumption (EC)

—

MJ of energy saved on this project

Homes powered (quarterly)

—

Australian homes fully powered for 3 months

Project Actions & Next Steps

Export · Quote · Consult
Katana Foundations Pty Ltd — calculations are engineered estimates based on structural presets. Contact Katana Foundations for a tailored quote.

Prepared For

—

—

—

Project Reference

—

—

—

1

Project Configuration Summary

Total Pile Count

—

Average Depth per Pile

—

2

Cost & Savings Evaluation

Comparative cost analysis — concrete bored piers vs. Katana engineered screw pile technology:

Concrete Bored Pier Total

—

Katana Screw Pile Total

—

Project Saving

—

Relative Budget Share

Concrete Bored Pier
Katana Screw Pile
🌿

Environmental Impact — Choosing Screw Piles

Carbon Saved (GWP)

—

kg of CO₂ saved on this project

🌳 — trees / year  ·  🚗 — km driven

Energy Saved (EC)

—

MJ of energy saved this project

⚡ Fully power — homes for 3 months

Source: Swinburne University LCA Study, Feb 2026. Screw piles = 56% less GWP & 34% less EC vs concrete bored piers (50 piles, 3m average job, full lifecycle).

Generated via the Katana Digital Savings Estimator. Detailed technical breakdown on page 2. Page 1 of 2
3

Technical Cost Breakdown & Advanced Assumptions

Disclaimer: All calculations are engineered estimates based on structural presets and standard industry rates. Values are indicative only. Structural plans must be signed off by a certified engineer prior to final layout placement. Contact Katana Foundations for a tailored quote.

Katana Foundations Pty Ltd — Registered offices Australia-wide. Page 2 of 2