Screw pile systems engineered in accordance with AS 2159, with clear load capacities, connection details and installation verification to support confident specification from design through to delivery.

Why Engineers choose Katana

Evidence of Suitability, tier by tier.

CodeMark is the highest tier of Evidence of Suitability under the NCC — independently audited, not self-declared. It means the product you’ve specified has been verified by a third party and is subject to ongoing surveillance.

 

That’s not a marketing claim. It’s a certification condition.

 

Katana is the only Australian screw pile manufacturer and installer holding CodeMark certification (CM30096 in Australia, CM30097 in New Zealand). Specifying Katana doesn’t just give you a screw pile — it gives you a documented, audited, NCC-compliant foundation system that stands up to scrutiny from any direction.

 

Next time you specify screw piles, ask yourself: are you crossing your fingers, or choosing certainty?

 

Four components. One tested system.

Each component has undergone meticulous design and testing, ensuring a seamlessly connected system that meets load capacity and engineering design requirements – no improvised connectors.

The Top Plate / Drive Nut
A 16mm thick plate with a 36mm threaded hole accepts multiple Katana accessories for locking in concrete footings – and engages the drive tool to reduce the likelihood of the pile falling out of the drive head while drilling.

The Pile Shaft
The shaft is Australian made Grade 350+ high-tensile steel. Thick-walled pipe sections (4.0mm and 5.5mm) mean Katana screw piles do not require concrete core filling.

The twin helical plates
The twin-fin helix is symmetrically designed to slice through underlying strata –  drilling faster and deeper into harder soils with no spoil. Helix diameters range 250mm to 350mm by pile size.

 

The Cutting Comb
First point of contact with the soil: the tooth design cuts through hard material, and its symmetry with the twin-fin blades keeps vertical alignment accurate.

TECHNICAL EXCELLENCE

The five questions engineers
ask us first:

Katana foundations are designed and engineered to perform in Australia’s toughest conditions. We collaborate closely with structural engineers to deliver fully compliant, high-capacity screw pile solutions.

Specifying screw piles does not expose the design engineer to additional liability beyond what they carry when specifying any other foundation system. The division of responsibility follows the same model as bored pier specification.

 

The design engineer’s scope covers: pile loads, pile layout relative to the slab, connection detailing between the pile and slab, and depth requirements driven by proximity to underground services, pools, or zones of influence.

 

Katana’s scope covers everything pile-related: supplying piles fit for purpose, installing them according to the connection detail and engineering design intent, and engaging an independent engineer to review installation records and issue a Certificate of Compliance. The design engineer does not carry responsibility for pile selection, pile design, or installation verification. That sits entirely with the piling contractor.

 

In short: you specify what the foundation system needs to achieve; Katana is responsible for demonstrating that it has been achieved.

The 1.25Hs depth criterion in AS2870 Appendix G is informative, not mandatory. It provides guidance rather than a prescriptive requirement and may be varied where engineering judgement and site-specific assessment support an alternative approach.

 

AS2870 was last revised in 2011. Since then, significant advances have occurred in geotechnical understanding, ground movement modelling, and documented field performance of screw piles. The 1.25Hs recommendation is now widely regarded as conservative, particularly when applied uniformly without reference to actual soil movement behaviour with depth.

 

Using the concepts embedded in AS2870 (Ys, Hs, and the soil suction profile), soil movement reduces progressively with depth. On a typical Class M site with maximum surface movement of ~40mm, movement reduces to <5mm by ~0.75Hs and approaches zero at Hs. If soil movement reduces to negligible levels at or before Hs, extending piles a further 25% beyond that depth offers little engineering benefit.

 

For context, concrete bored piers are commonly specified with embedment depths such as 900mm into natural material, even where soil movement may still be present. AS2870 does not impose an equivalent depth multiplier or explicit movement-based check for bored piers. The 1.25Hs rule should be assessed on a project-by-project basis with informed engineering judgement regarding movement risk and structural requirements.

Corrosion management addresses two distinct environments:

In-ground corrosion: AS2159 Section 6.5.3 requires allowance for section loss over design life based on exposure classification (mm/year). Katana provides closed-form CHS sections fully sealed at both ends. As acknowledged in AS2159, internal corrosion on fully sealed sections is assumed to be negligible since soil cannot enter. Corrosion acts on the external face only, doubling the serviceable wall thickness available for corrosion allowance and extending calculated design life accordingly. Katana uses site geotechnical exposure classifications (or location data) to determine protection levels.

 

Above-ground corrosion: AS2159 Section 6.5.4 requires consideration of coating type, thickness, surface preparation, service life, and installation risk (complying with AS/NZS 2312). Katana’s standard specification for above-ground sections is hot-dipped galvanisation in accordance with AS/NZS 2312.

 

Generally, no. In line with AS2870 Clause G8, sites with a Class M or higher reactivity can experience significant upward swell pressure on the underside of the slab. Tying or engaging the slab to screw piles on reactive soils creates structural risk, as swelling pressure can cause the piles along edge beams to crack or detach from the slab.

 

Detailing to avoid uplift on pile-supported structures is recommended. Piles should typically remain unengaged unless specific design constraints demand engagement, in which case swell pressures (ps = √(1000 ys k)) and uplift forces must be formally accounted for in strength design with appropriate load factors.

Screw piles perform exceptionally well in:

• Reactive or collapsible soils

• Deep fill or loose ground

• Wet or water-affected ground

• Unstable or landslip ground

• Sites with restricted access or limited concrete supply

• Low-disturbance installation requirements

• Applications requiring fast installation and quick loading

• Underpinning existing structures

• Projects with strict sustainability requirements

 

Screw piles are generally not the best fit where installation becomes difficult, unreliable, or unviable, including:

• Large rocks, boulders, or very coarse gravel

• Hard rock where penetration is required

• Shallow rock profiles

• Severe or very severe soil conditions

• Extremely high atmospheric or soil corrosion categories (C4, C5, Cx)

• High lateral capacity requirements (without supplemental engineering measures)

Talk to someone who speaks

pile logs and AS2159.

Our solutions team works with structural engineers daily

on regulation and risk, pile capacity, torsion, strength and durability, site classification and

determination of depth, and pile logs, certification and insurance.

We also present to consultancies, certifiers, surveyors and building teams

in person or online, typically 30–45 minutes plus questions.

Jordan Lieng

Solutions engineer

Aayush Chaurasia

Applications Engineer

OUR PROJECTS